CBV PROJECTS
BACKGROUND
Gas Pipe 34″
ENAP – Argentina, Patagonia
____
Pipelay gas system 34″
FPSO Brazil
Serviços Maritmos Continental| SBM
Brazil, Campos Basin
____
FPSO Installation & Pull In campaign
Bijupirá & Salema
Shell – Brazil, Campos Basin
____
FPSO “Fluminense” Mooring hook-up, Riser pull-in and pre-comissioning. Engineering procedures, analysis and offshore supervision.
FPSO Espadarte
Serviços Maritmos Continental| SBM
Brazil, Campos Basin
____
FPSO Installation & Pull In campaign
FPSO Marlim Sul
Serviços Maritmos Continental| SBM
Brazil, Campos Basin
____
FPSO Installation & Pull In campaign
FPSO Marlim Sul
Serviços Maritmos Continental| SBM
Brazil, Campos Basin
____
WUILD / riser Inspection
Ormen Lange
Norsk Hydro – Norway
____
Umbilical installation – Tensioner vs umbilical testing, design of installation aids, field layout routes. 125km single length umbilical.
P-08 Pull In Campaign
Petrobras |Continenta
Brazil, Campos Basin
____
Flexible riser Pull-In Campaign
TEFRAN PETROBRAS Singly buoy System
Petrobras |Continental
Brazil, Santa Catarina
____
Rigid Pipelay and Single buoy Installation
Terminal Tramandai Singly buoy System and PLEM
Petrobras |Continental
Brazil, Rio Grande do Sul
____
Rigid Pipelay, PLEM and Single buoy Installation
P-08 riser Inspection Campaign
Petrobras |Continental
Brazil, Campos Basin
____
Flexible riser inspection from -30Mts up to splash zone / Riser Pull In Operation
FPSO Cidade de Vitoria
SAIPEM – Brazil, Campos Basin
____
Flexible riser Pull-In Campaign
BC-10 Phase I
Shell – Brazil, Campos Basin
____
Rigid Pipeline installation Engineering support and fatigue analysis.
FPSO Cidade de São Mateus
Prosafe Productions
Brazil| Singapore
____
FPSO pre mooring setup / shipyard mooring operation / FPSO Installation – mooring – pull in campaign
FDPSO Azurite
Prosafe Productions
Singapore | Congo
____
FDPSO Mooring / tethered Buoy Installation and Offload hose connection / Hull| sea chest Inspection/recovery & reinstallation of mooring legs.
Salema
Shell – Brazil, Campos Basin
____
FPSO “Fluminense” Riser replacement – pull-out and pull-in Engineering support and offshore supervision.
Peregrino
Statoil – Brazil, Campos Basin
____
Flexible Risers and Umbilical installation analysis and engineering procedures for the FPSO “Peregrino” and WHP-A and WHP-B.
FPSO Spoir
BW – Prosafe – Ivory Coast
____
FPSO recovering of mooring leg / retensioning of mooring system / bearing turret inspection
Waimea (aka Tubarão Azul)
OGX
Singapore| Spain|UK | Belgian|Brazil
____
Overseas Logistic / shorebase setup / FPSO Offshore Installation / Pull in Campaign / Operations Management / PLSV Aker Wayfarer Operations Management
Waimea (aka Tubarão Azul)
OGX – Brazil, Campos Basin
____
Engineering Management for Pipelines, Umbilicals, MWA and Mooring installation for the FPSO “OSX-1”.
FPSO OSX 2
OGX – Singapore
____
Supervision of Turret and Bell mouth setup at shipyard
Tubarão Azul
OGX – Singapore| UK | Brazil
____
Overseas Logistic / shorebase setup / FPSO Offshore Installation / Pull in Campaign / Operations Management / PLSV Aker Wayfarer Operations Management
Tubarão Azul
OGX – Brazil, Campos Basin
____
Engineering Management for Pipelines, Umbilicals and MWA installation for the FPSO “OSX-3”.
PLSV Polar Onix
CEONA – UK – Brazil
____
Vessel Operations startup on arrival to Brazilian waters / Operations technical advisor
FPSO Brasil decomissioning
SBM Offshore – Brazil, Campos Basin
____
Rigging- diving team management / pull out campaign / offshore cliente interface /deep water hoses renoval / cutting of 9 mooring legs- abandonment / towing rigging
FPSO BAOBAB | MV10 UWILD
MODEC – Ivory Coast
____
FPSO BAOBAB | MV10 UWILD for life extension project
Flexible Load-out Base
QGEP – Brazil, Arraial do Cabo
____
Full design of a Flexible Pipe and Umbilical storage and load-out base in the “Porto do Forno”, RJ – Brazil.
FPSO Marlim Sul decomissioning
SBM Offshore – Brazil, Campos Basin
____
Rigging- diving team management / pull out campaign / offshore cliente interface /deep water hoses renoval / cutting of 9 mooring legs- abandonment / towing rigging setup
FPSO Parati | Saquarema | Maricá | CDI | CPX| Anchieta
SBM Offshore – Brazil
____
SURF / flexible risers Pull In -Out Operations / Heavy Lift valves operations. / Offshore diving and ROV operations / UWILD Campaign- IMCA Diving & ROV system audit- assurance / mooring operations
FPSO Fluminense Mooring Repair
Maersk – Brazil, Campos Basin
____
FPSO “Fluminense”: Engineering procedure and offshore supervision for top chain replacement and mooring line tensioning.
FPSO Parati | Saquarema | Maricá | CDI | CPX| Anchieta
SBM Offshore – Brazil
____
SURF / flexible risers Pull In -Out Operations / Heavy Lift valves operations. / Offshore diving and ROV operations / UWILD Campaign- IMCA Diving & ROV system audit- assurance / mooring operations
Fênix
PetroRio – Brazil, Campos Basin
____
Engineering Support, procedures and analysis for Flexible Pipeline and Umbilical Installation.
FPSO Fluminense Mooring Repair
Maersk – Brazil, Campos Basin
____
FPSO “Fluminense”: Engineering procedure, offshore supervision and logistics coordination for bottom chain replacement.
Fenix Project
PetroRio – Brazil, Campos Basin
____
FPSO “Bravo” Riser pull-out and pull-in engineering, analysis and operation coordination. Heading Control operations – Procedure, Towmasters, Survey and Rigging Team
MERO 3 Project
Misc Berhad – Brazil
____
Gas turbines Package Management