CBV PROJECTS

BACKGROUND

1998

Gas Pipe 34″

ENAP – Argentina, Patagonia
____
Pipelay gas system 34″

FPSO Brazil

Serviços Maritmos Continental| SBM
Brazil, Campos Basin
____
FPSO Installation & Pull In campaign

2002
2002-03

Bijupirá & Salema

Shell – Brazil, Campos Basin
____
FPSO “Fluminense” Mooring hook-up, Riser pull-in and pre-comissioning. Engineering procedures, analysis and offshore supervision.

FPSO Espadarte

Serviços Maritmos Continental| SBM
Brazil, Campos Basin
____
FPSO Installation & Pull In campaign

2003
2004

FPSO Marlim Sul

Serviços Maritmos Continental| SBM
Brazil, Campos Basin
____
FPSO Installation & Pull In campaign

FPSO Marlim Sul

Serviços Maritmos Continental| SBM
Brazil, Campos Basin
____
WUILD / riser Inspection

2005
2005-06

Ormen Lange

Norsk Hydro – Norway
____
Umbilical installation – Tensioner vs umbilical testing, design of installation aids, field layout routes. 125km single length umbilical.

P-08 Pull In Campaign

Petrobras |Continenta
Brazil, Campos Basin
____
Flexible riser Pull-In Campaign

2006
2006

TEFRAN PETROBRAS Singly buoy System

Petrobras |Continental
Brazil, Santa Catarina
____
Rigid Pipelay and Single buoy Installation

Terminal Tramandai Singly buoy System and PLEM

Petrobras |Continental
Brazil, Rio Grande do Sul
____
Rigid Pipelay, PLEM and Single buoy Installation

2006
2007

P-08 riser Inspection Campaign

Petrobras |Continental
Brazil, Campos Basin
____
Flexible riser inspection from -30Mts up to splash zone / Riser Pull In Operation

FPSO Cidade de Vitoria

SAIPEM – Brazil, Campos Basin
____
Flexible riser Pull-In Campaign

2007
2007-08

BC-10 Phase I

Shell – Brazil, Campos Basin
____
Rigid Pipeline installation Engineering support and fatigue analysis.

FPSO Cidade de São Mateus

Prosafe Productions
Brazil| Singapore
____
FPSO pre mooring setup / shipyard mooring operation / FPSO Installation – mooring – pull in campaign

2008
2009

FDPSO Azurite

Prosafe Productions
Singapore | Congo
____
FDPSO Mooring / tethered Buoy Installation and Offload hose connection / Hull| sea chest Inspection/recovery & reinstallation of mooring legs.

Salema

Shell – Brazil, Campos Basin
____
FPSO “Fluminense” Riser replacement – pull-out and pull-in Engineering support and offshore supervision.

2009
2009

Peregrino

Statoil – Brazil, Campos Basin
____
Flexible Risers and Umbilical installation analysis and engineering procedures for the FPSO “Peregrino” and WHP-A and WHP-B.

FPSO Spoir

BW – Prosafe – Ivory Coast
____
FPSO recovering of mooring leg / retensioning of mooring system / bearing turret inspection

2010
2010

Waimea (aka Tubarão Azul)

OGX
Singapore| Spain|UK | Belgian|Brazil
____
Overseas Logistic / shorebase setup / FPSO Offshore Installation / Pull in Campaign / Operations Management / PLSV Aker Wayfarer Operations Management

Waimea (aka Tubarão Azul)

OGX – Brazil, Campos Basin
____
Engineering Management for Pipelines, Umbilicals, MWA and Mooring installation for the FPSO “OSX-1”.

2010-12
2010

FPSO OSX 2

OGX – Singapore
____
Supervision of Turret and Bell mouth setup at shipyard

Tubarão Azul

OGX – Singapore| UK | Brazil
____
Overseas Logistic / shorebase setup / FPSO Offshore Installation / Pull in Campaign / Operations Management / PLSV Aker Wayfarer Operations Management

2012-14
2012-14

Tubarão Azul

OGX – Brazil, Campos Basin
____
Engineering Management for Pipelines, Umbilicals and MWA installation for the FPSO “OSX-3”.

PLSV Polar Onix

CEONA – UK – Brazil
____
Vessel Operations startup on arrival to Brazilian waters / Operations technical advisor

2014
2014

FPSO Brasil decomissioning

SBM Offshore – Brazil, Campos Basin
____
Rigging- diving team management / pull out campaign / offshore cliente interface /deep water hoses renoval / cutting of 9 mooring legs- abandonment / towing rigging

FPSO BAOBAB | MV10 UWILD

MODEC – Ivory Coast
____
FPSO BAOBAB | MV10 UWILD for life extension project

2015
2015-16

Flexible Load-out Base

QGEP – Brazil, Arraial do Cabo
____
Full design of a Flexible Pipe and Umbilical storage and load-out base in the “Porto do Forno”, RJ – Brazil.

FPSO Marlim Sul decomissioning

SBM Offshore – Brazil, Campos Basin
____
Rigging- diving team management / pull out campaign / offshore cliente interface /deep water hoses renoval / cutting of 9 mooring legs- abandonment / towing rigging setup

2015-16
2016-19

FPSO Parati | Saquarema | Maricá | CDI | CPX| Anchieta

SBM Offshore – Brazil
____
SURF / flexible risers Pull In -Out Operations / Heavy Lift valves operations. / Offshore diving and ROV operations / UWILD Campaign- IMCA Diving & ROV system audit- assurance / mooring operations

FPSO Fluminense Mooring Repair

Maersk – Brazil, Campos Basin
____
FPSO “Fluminense”: Engineering procedure and offshore supervision for top chain replacement and mooring line tensioning.

2019-20
2020-21

FPSO Parati | Saquarema | Maricá | CDI | CPX| Anchieta

SBM Offshore – Brazil
____
SURF / flexible risers Pull In -Out Operations / Heavy Lift valves operations. / Offshore diving and ROV operations / UWILD Campaign- IMCA Diving & ROV system audit- assurance / mooring operations

Fênix

PetroRio – Brazil, Campos Basin
____
Engineering Support, procedures and analysis for Flexible Pipeline and Umbilical Installation.

2020-21
2021

FPSO Fluminense Mooring Repair

Maersk – Brazil, Campos Basin
____
FPSO “Fluminense”: Engineering procedure, offshore supervision and logistics coordination for bottom chain replacement.

Fenix Project

PetroRio – Brazil, Campos Basin
____
FPSO “Bravo” Riser pull-out and pull-in engineering, analysis and operation coordination. Heading Control operations – Procedure, Towmasters, Survey and Rigging Team

2021
2021

MERO 3 Project

Misc Berhad – Brazil
____
Gas turbines Package Management